Your Future Career

Join the staff of the Company by submitting your CV to:

CEO
Pelle Seman, Sweden
email: pelle@sembrac.se
or
pelleshort@gmail.com

phone: +46 707 36 62 42, incl WhatsApp, Viber, OMO


References:

Water Resources and Environment

i) Assessment of the IFC contribution to the privatisation of the water supply and sanitation utilities, demonstrated by 22 water utilities in Eastern Uganda;

ii) EIA for the Akanyaru Peat Production and Energy Generation Plant in Rwanda;

iii) Strategic ESIA of the Energy Sector in Rwanda, including dams for hydropower, solar, geothermal, methane and biomass utilisation, financed by EU;

iv) Programme Preparation in Integrated Water Resources Management for the Sio-Malaba-Malakisi and Mara River Basin studies focusing on dams for water supply, irrigation and hydropower in Uganda, Kenya and Tanzania, financed by WB;

v) Water Quality Assessment Expert for ENTRO in Egypt, Ethiopia, South Sudan and Sudan to assess the quality of the monitoring network in the countries together at the gauging stations for stage and discharge monitoring, financed by AFD;

vi) Water Quality in the Baro-Akobo-Sobat Study Project in Ethiopia and South Sudan for ENTRO;

vii) Kagera water development assignment, focusing on investment proposals on dams for water supply, irrigation and hydropower in Uganda, Kenya and Tanzania. Client NELSAP, financed by WB;

viii) Other ENTRO and NBI assignments, where Ethiopia is one of the parties of the programme;

ix) Update about 20 IFC Environmental, Health and Safety guidelines; specifically EHS guidelines for Water supply facilities, Wastewater Treatment, Waste Management, Hazardous Waste Management and Energy Generation facilities, financed by IFC;

x) Sida financed courses in Climate Change Mitigation and Adaptation, run for the last 10+ years in cooperation with the Swedish Hydromet Services, SMHI.

xi) Sibilu Dam Project: Feasibility Studies, Detail Designs of Dam, Water Treatment Plant, Pumping Stations and double dia 1.6 m, 36 km long transmission pipeline to lift the 5m3/s treated water 400 m to Entoto Mountain, from where a 5m dia, 5 km long tunnel supplies the water to Addis Ababa. Client: AAWSA, financed by WB, implemented by DOHWA-FCG-MCE JV.

 

Dela den här sidan