Activities

 Planning and execution of assignments:

Feasibility Studies, Designs, Supervision of Construction and Operation, Contract Administration, Assessment of Contractor Tenders and Recommendations to Client on selection of Contractors; and follow up in the fields of:

  • Water and Environment, specifically in Water Resources Engineering and Management, Water Supply, Sewerage and Solid Waste, and Environmental Management, including ESIA, RAP, ESMF, EA etc.
  • sustainable development of urban, suburban and rural environments, with emphasis on Climate Resilience and Adaptation are focus areas of SEMBRAC.
  • provision of services to Suppliers and Contractors as representatives and agents in the fields of water,  sewerage and solid waste.

 

Dam site survey team for the Sibilu Water Supply Project for Addis Ababa passing by a village in the catchment area

Dam site survey team for the Sibilu Water Supply Project for Addis Ababa passing by a village in the catchment area

The ideal V-shaped valley proposed for a 100m high, 600m wide dam with a very limited socio-economic impact, the RAP shows only 30 families to be affected

The ideal V-shaped valley proposed for a 100m high, 600m wide dam with a  very limited socio-economic impact, the RAP shows only 30 families to be affected

Dela den här sidan